
Higher Education
UF-695 Black Hall 4th Floor Lab Renovations
Client
Stellar Construction
Project Owner
University of Florida
Location
Gainesville, Florida
Project Value
$6,500,000
Industry
Higher Education
Account Executive(s)
Joshua Harden, Trey Wilson
Services Provided
Proposal Development |

Higher Education
UF-695 Black Hall 4th Floor Lab Renovations
Client
Stellar Construction
Project Owner
University of Florida
Location
Gainesville, Florida
Project Value
$6,500,000
Industry
Higher Education
Account Executive(s)
Joshua Harden, Trey Wilson
Services Provided
Proposal Development |

Project Overview
The UF-695 Black Hall 4th Floor Lab Renovations project was a $6.5 million higher education renovation in Gainesville, Florida, commissioned by the University of Florida. The scope transformed the entire 8,658 GSF fourth floor of Black Hall into an interdisciplinary bio-tech laboratory for the Herbert Wertheim College of Engineering. The program included wet lab bench space, a cGMP laboratory, BSL II tissue culture rooms, autoclave rooms, collaboration spaces, and infrastructure for at least six Principal Investigators. Additional scope covered ADA upgrades, HVAC improvements, and elevator modernization, with mandatory Green Globes 3 Certification. The client engaged PRESWERX to support the pursuit with a written proposal.

Client Challenges
The client was pursuing a technically specialized laboratory renovation for one of the country's top public research universities under a formal procurement process. The pursuit carried several distinct challenges:
Communicating a highly technical bio-tech laboratory program to a research institution with precise requirements for wet lab infrastructure, clean manufacturing space, and biosafety compliance.
Demonstrating the team's ability to manage multiple concurrent subprojects, including lab renovation, HVAC and fume hood work, ADA accessibility upgrades, and elevator modernization, within a coordinated scope.
Meeting a mandatory Green Globes 3 Certification requirement as a nonnegotiable condition of the project.
Presenting a clear, technically credible approach that matched the rigor of a University of Florida research facilities procurement.
Together, these demands called for a proposal that matched the depth and specificity of a specialized research facility renovation.

Scope of Work
PRESWERX developed the written proposal for the UF-695 Black Hall renovation pursuit. The proposal presented the client's qualifications and construction approach in a format suited to a University of Florida procurement process. It addressed the project's layered complexity directly: the bio-tech laboratory program with cGMP and BSL II requirements, the coordinated HVAC and fume hood subproject, ADA compliance upgrades, elevator modernization, and the path to mandatory Green Globes 3 Certification. Every section was written to demonstrate a construction partner with the technical depth and institutional familiarity the University of Florida expected for a specialized research facility renovation.


PRESWERX Approach
PRESWERX approached the proposal as a technically demanding higher education pursuit where the range of concurrent scopes and the mandatory sustainability certification required a clear, well-organized narrative.
Structured the proposal to address each subproject as part of a coherent, coordinated program, covering lab renovation, HVAC work, ADA upgrades, and elevator modernization as an integrated scope.
Framed the client's capabilities around the specific technical requirements of biotech laboratory construction, including cGMP standards, BSL II protocols, and the Green Globes certification pathway.
Wrote with the precision and technical specificity a University of Florida research facilities procurement demands.
The result was a proposal that conveyed the client's readiness to manage a multifaceted, technically specialized university project.
Results Delivered
PRESWERX delivered a technically precise, well-structured proposal that gave the client a strong foundation for a specialized University of Florida procurement. The document was built to perform against a highly technical evaluation rubric.
The proposal addressed the full project scope clearly, from cGMP and BSL II laboratory requirements to HVAC subproject work, ADA compliance, and elevator modernization.
Each section demonstrated the client's understanding of both the technical requirements and the institutional expectations of a research university.
The Green Globes certification path was presented as an integral part of the construction approach, not an afterthought.
The client submitted a proposal built to the standard a specialized University of Florida research facility renovation demands.


SUCCESS STORIES
Proven Results Across High-Stakes Pursuits
Explore how we’ve helped leading A/E/C teams craft standout proposals and presentations, build confidence, and win major projects with strategy, storytelling, smart visuals, and coaching.


.png)


