Heavy Civil
Arrivals and Departures Hall
Client
The Austin Company
Project Owner
City of Austin, Department of Aviation
Location
Austin, Texas
Project Value
$620,000,000
Industry
Heavy Civil
Account Executive(s)
Joshua Harden, Trey Wilson
Services Provided
Architectural Visualization Animations |
Construction Logistics Animations |
Presentation Coaching |
Presentation Development |
Renderings & Animations |
Still Renderings |

Heavy Civil
Arrivals and Departures Hall
Client
The Austin Company
Project Owner
City of Austin, Department of Aviation
Location
Austin, Texas
Project Value
$620,000,000
Industry
Heavy Civil
Account Executive(s)
Joshua Harden, Trey Wilson
Services Provided
Architectural Visualization Animations |
Construction Logistics Animations |
Presentation Coaching |
Presentation Development |
Renderings & Animations |
Still Renderings |

Project Overview
The City of Austin Department of Aviation pursued a $620 million Arrivals and Departures Hall to serve as the new front door to Austin-Bergstrom International Airport. The base scope included removal of the existing Red Garage, realignment of Presidential Boulevard, new curbside and roadway infrastructure, pedestrian bridges connecting parking and rental car facilities to the new hall, and all associated utilities work. The building itself encompassed passenger ticketing and check-in, domestic baggage claim, concessions, public amenities, airline and TSA space, and Department of Aviation offices, with a direct connection to the existing Barbara Jordan Terminal for uninterrupted access to security screening. Planning for phased future additions was included in the base scope. The client engaged PRESWERX to develop the presentation and produce renderings and animations, then prepare the team through coaching for the live selection interview.

Client Challenges
A $620 million airport terminal project for one of the fastest-growing cities in the country presented a pursuit challenge at every level. The client needed to address several simultaneously:
Visualizing a complex, multi-component airport facility that did not yet exist, including the new hall, curbside infrastructure, pedestrian bridges, and its connection to the existing Barbara Jordan Terminal.
Communicating the team's capacity to manage one of the most logistically demanding construction environments in aviation, with active airport operations continuing throughout a major demolition and new construction program.
Preparing for a high-stakes city aviation interview where evaluators would hold every presenter to the standard expected of a team capable of delivering a landmark gateway for a city under intense national growth pressure.
The pursuit demanded a complete package built to the level of ambition the project represented for Austin and its traveling public.

Scope of Work
PRESWERX produced renderings, animations, and a structured presentation for the client's A/D Hall pursuit, then ran coaching sessions ahead of the live interview. Renderings depicted the new terminal hall in context on the airport campus, capturing the building's scale, its curbside relationship, and the pedestrian bridge connections to parking and rental car facilities. Animations provided a dynamic walkthrough of the facility, moving through the arrival and departure sequences to convey how the new hall would function as a seamless gateway for AUS passengers. The presentation organized the team's aviation construction experience around the project's specific scope and delivery challenges. Coaching sessions prepared the full team for a city aviation interview, with emphasis on active-airport construction protocols, phasing strategy, and the team's approach to the Barbara Jordan Terminal connection.


PRESWERX Approach
PRESWERX approached the A/D Hall pursuit as a civic identity challenge as much as a construction competition. Austin's airport gateway carries the weight of the city's growth story, and the visuals and narrative needed to reflect that:
Produced renderings and animations that presented the new hall as a true airport gateway, emphasizing the passenger experience from curbside arrival through ticketing and into the terminal connection, not just the building's exterior form.
Structured the presentation to address the project's multi-component complexity, covering the demolition, roadway realignment, new construction, and BJT connection as parts of a coordinated delivery strategy.
Focused coaching on the live operational and phasing questions a city aviation owner would probe, ensuring every presenter could speak with precision about constructing in an active airport environment.
The result was a pursuit package built to the scale and significance of one of the largest aviation infrastructure investments in Austin's history.
Results Delivered
PRESWERX delivered a complete pursuit package calibrated to one of the most consequential airport procurements in Texas. Each deliverable served a distinct role in the client's selection strategy:
Renderings and animations that gave city aviation evaluators a compelling, passenger-centered picture of the new A/D Hall, showing the full scope from curbside infrastructure through interior circulation and terminal connection.
A structured presentation that made the client's aviation construction credentials and delivery approach immediately legible to an experienced city aviation selection panel.
A coached team that entered the selection room prepared to perform at the level Austin's Department of Aviation expected from a partner it would trust with the airport's defining infrastructure project.
The client entered the selection process with a pursuit package that matched the ambition of a project designed to serve Austin for decades.